Legislation Details

File #: 26-276    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 11/10/2026 In control: Sustainability Committee
On agenda: 11/16/2026 Final action:
Title: NATURAL GAS CONNECTIONS FOR NEW CONSTRUCTION

TO:                     SUSTAINABILITY COMMITTEE

 

FROM:                     JEREMY SWAN, COMMUNITY SERVICES DIRECTOR

 

DATE:                     NOVEMBER 16, 2026

 

Title

NATURAL GAS CONNECTIONS FOR NEW CONSTRUCTION

Body                     

 

SUMMARY

 

The State of California adopts an updated Building Standards Code every three years. Most California codes are based on the International Building Code published during the preceding code cycle and are then amended to address California-specific conditions such as seismic design, accessibility, wildfire protection, and energy efficiency. The California Energy Code is an exception, as it is developed by the California Energy Commission and is recognized as one of the most comprehensive and stringent statewide energy codes in the United States.

 

Beginning with the 2022 California Energy Code (effective January 1, 2023), new residential construction proposing natural gas or propane appliances became subject to electric-ready requirements. When gas appliances are installed, electrical infrastructure must also be provided to facilitate future conversion to electric appliances. These requirements apply to gas furnaces, cooktops or ranges, clothes dryers, and water heaters.

 

The 2025 California Energy Code (effective January 1, 2026) expanded these requirements for multifamily residential construction by requiring the electrical infrastructure of the building to be capable of supporting future electrification. In addition to branch circuits serving individual dwelling units, multifamily developments must provide electrical capacity and infrastructure to accommodate future electric appliances, including space and electrical provisions for heat pump water heaters. From a construction perspective, these requirements increase the amount of infrastructure required when natural gas appliances are installed, as both gas piping and electrical infrastructure must be provided for the applicable appliances. This results in additional materials, labor, coordination, and construction costs compared to all-electric construction. Therefore, there is often a financial incentive to pursue all-electric designs in new construction.

 

RECOMMENDATION

 

Recommended Action

Staff recommends that the Sustainability Committee receive and file the report.

Body

 

ALTERNATIVE TO RECOMMENDATION

 

In addition to the recommendation, there is the following alternative:

 

•                     Request additional information from staff.

 

ANALYSIS

 

The Claremont Building Division has observed that many developers are choosing all-electric construction rather than installing both gas and electric infrastructure. Current multifamily developments on Foothill Boulevard have been designed without natural gas or propane services, relying exclusively on electric appliances. Likewise, the Parkview single-family residential development has been designed as an all-electric project without natural gas or propane connections. Based on recent development trends, the practical effect of the California Energy Code's electric-ready requirements has been an increased preference for all-electric construction, as it eliminates the need to install both gas and electrical infrastructure for the same appliance locations while simplifying construction and reducing installation costs. With the completion of the Olson Town Homes and the Park View single-family home projects, the City of Claremont will be adding an additional 110 all-electrified units to Claremont.

 

PUBLIC NOTICE PROCESS

 

The agenda and staff report for this item have been posted on the City website and distributed to interested parties. If you desire a paper copy, please contact the City Clerk’s Office.

 

 

Submitted by:                     Prepared by:

 

Jeremy Swan                     Joseph Caro

Community Services Director                     Building Official